Manuscript Em03-C@1 · Em03-C-v1.tex · section · 47dd71ec

A joint apparatus ledger

Resources, attainable tolerances, and semantic scope › A joint apparatus ledger · lines 2483–2568

Back to manuscript

The construction uses two oscillator memories, not two qubits. Initial extraction-domain dimensions are ; the modeled maximum leakage-domain dimensions are . Capture itself is not restricted to finite occupation support.

With spectator qubits, the retained register and pointer occupancy is . If the finite joint noise bath is stored in the laboratory, its qubit embedding must also be counted. Fresh reset registers and their peak overlap with retained registers are additional preparation resources, not silently included in this number.

{}1.12

ResourceDeclared quantity
ResourceDeclared quantity
Shared captureOne effective temporal port; window ; two compact orthonormal tests; vector ; memory mixing ; bounds (eq:capturebounds).
MemoriesTwo oscillators; joint preparation ; storage duration , rate ; initial cutoffs ; maximum controlled leakage levels .
Extraction selective pulse components; duration ; finite-rank exact generator; joint bounded deviation ; register preparation .
Phase-sensitive controlsAt most single-qubit rotations per setting; fixed phase convention; rotation error integrals .
Readout pointer qubits; ideal controlled-NOT copies; duration ; joint finite bath and generator ; full matrix .
Reset and readinessFresh independent preparation systems; joint errors ; readiness failure probability ; visible failure output.
Repeated testsA sufficient, not optimized, schedule has preparations for tomography. Different Pauli strings can share bases, but such reuse is not needed by the proved schedule.
Classical recordsSetting, both raw words, both declared decoded values, all failure flags, and trial identifier. No failed trial is removed.
SpectatorsStored throughout the sequence; all modeled coupling errors are included in the named joint generators. Additional decoherence requires an additional complete comparison.
ReferencesRetained in correctness statements; not laboratory memory.
Energy and workOscillator free energies, control phase references, cooling, bath delivery, and reset work require separately supplied physical models. No thermodynamic optimum is claimed.

The preparations can be represented by replacement through swaps with fresh systems in the stated states, discarding old apparatus states into the preparation environment. This supplies complete preparation channels. It does not prove cooling costs or independence in a reused experimental device.