Manuscript Em03-C@1 · Em03-C-v1.tex · theorem · 47dd71ec
Theorem: Exact joint assignment error and readout budget
Joint extraction and complete correlated readout › One complete joint pointer model · lines 1615–1673 · proof included or linked
Em03-C@1#thm:readout, Em03-C@1#eq:assignment, Em03-C@1#eq:readbudget
For ideal destructive readout followed only by ,
For the complete pointer model above, its error against the corresponding ideal readout is at most
Proof. The assignment instrument is
An isometry realizing its assignment sends to , with orthonormal environmental labels.
For any input operator with a reference, pinching in the computational basis is trace-norm contractive. Its diagonal blocks obey . The complete norm of the assignment difference is therefore at most
A basis input attaining the maximum gives equality.
On a ready branch, replacing the independent pointer preparation costs . Lemma lem:stability gives for the actual joint pointer evolution. Assignment then costs . Convexity prices the visible failure branch by , proving (eq:readbudget).
Displayed formulas in this passage
Em03-C@1#eq:assignment · line 1618
Em03-C@1#eq:readbudget · line 1629
unlabeled · line 1641
unlabeled · line 1660