Manuscript En02-D@4 · En02-D-v4.tex · theorem · e19ec871

Theorem: Prepared-state turnover

Absorption and drain-free turnover · lines 887–909 · proof included or linked

En02-D@4#thm:turnover

Back to manuscript

For , deterministic emission, initial state , and extraction of in order, apply between emissions three and four. At perfect transmission,

The third prefix retains Theorem thm:benchmark with width and .

Proof. The first three channels are the benchmark channels with known descending mode labels. The remaining Bell-partner reduction is , unchanged by the controlled . After the fourth extraction it is ; after the fifth the core is one-dimensional. No exceptional drain operation is used.

Displayed formulas in this passage

  • unlabeled · line 893

Nearby in this section