Manuscript En05-B@1 · En05-B.tex · section · 8b626460
Conclusion
Milestone audit, repairs, and interpretation › Conclusion · lines 1909–1933
The central scheduling problem is solved here by a specific architecture: distinct lane endpoints, one local junction clique, and synchronized parallel lane frames. Its cost is growing degree, block size, and interfaces. Its benefit is an explicit estimate under one clock:
with , , and .
The resulting operational continuum limit is isotropic, carries unknown quantum states without losing their references, and preserves matched finite interventions. It is deliberately a finite-experiment transport limit, not a spacetime-emergence or field-theory theorem.
Displayed formulas in this passage
unlabeled · line 1916