Manuscript En08-B@1 · En08-B.tex · section · 23cac52a
Null targets and future-directed rounding
The connecting theorem › Null targets and future-directed rounding · lines 681–716
En08-B@1#eq:null-construction, En08-B@1#eq:B, En08-B@1#eq:H
Let be null:
Define
First execute the route to . If necessary, wait there until tick . Thus .
This final waiting convention repairs a possible sign issue: rounding inward can make the unpadded route arrive slightly before the original continuum target time. Spatial rounding alone does not prove a nonnegative delay relative to .
For , define
Displayed formulas in this passage
En08-B@1#eq:null-construction · line 688
En08-B@1#eq:B · line 706
En08-B@1#eq:H · line 706
unlabeled · line 684