Manuscript En10-B@1 · En10-B.tex · section · a1105bad
Mathematical release versus physical realization
The six physical obligations and the exact remaining gap › Mathematical release versus physical realization · lines 1781–1797
remaining gap. A successor must construct, on one named physical positron source model, a complete acquisition instrument with a microscopically justified source encoding and transport/detector channel, and prove the calibration and comparison package needed for (eq:physical-radius). It must also specify which competing explanations are included and either distinguish them or retain their common-law ambiguities.
Until that package is supplied, En10-A remains a finite analog with its declared estimation contract. En10-B adds a derived finite-model pilot and conditional bridge mathematics; it does not establish physical positron-source identification.