Manuscript Oai282-A@1 · Oai282-A.tex · section · 5b6134ec

All six completion tests

The separate characteristic-map chain › All six completion tests · lines 1833–1908

Back to manuscript

{ {}1.15

StepRequired constructionCompletion test and present scope
StepRequired constructionCompletion test and present scope
1Full joint characteristic map.A map on tests meeting the characteristic locus, respecting reconstruction descent, canonical-domain agreement, all retained branches and grouped cross-lines. The supplied I3/J2 full target remains unresolved. No such map is constructed here.
2Joint section and complete remainder.A result for the same complete map and frozen data. The internal I2 remainder is not this quantum remainder. Not constructed here.
3Uniform transverse estimates.Control in the actual transverse variables, including collision strata and their intersections. Internal frequency homogeneity does not supply it. Not constructed here.
4Contact compatibility.Compatibility with the permitted contacts and singular spectators, overlap agreement, and retained normalization. The finite Ward-fit matrix is not this contact class. Not constructed here.
5Output wavefront theorem.A proved bound after the actual full composition and proper pushforward into the named output space. A partial off-locus reference is insufficient. Not constructed here.
6Normalized quantum admission.Identification of the complete coefficient and proof of . No such admission is asserted. The downstream exit is not opened.

}

The supplied supported sector is not the full sum . The two placements and the remaining retained branches cannot be dropped CheungXIVI,CheungXIVJ.

The historical H2 stop, the reported internal advancement at I2, and the missing full map at I3/J2 are different statements CheungXIVH,CheungXIVI,CheungXIVJ. Failure to construct the map is not a theorem that every permitted construction is impossible.

Neither a finite-dimensional Ward correction fit nor a source improvement scalar supplies the absent distribution. The full analytic programme is preserved as an open contract.