Manuscript X-K-ST@1 · X-K-ST.tex · section · 93c39c0f
A mathematical reference is not a delivered control
Regular transport and record readiness › A mathematical reference is not a delivered control · lines 713–720
The alternative is to perform the controlled operation at the sender before departure, or to include the record in the transported payload and charge the enlarged payload dimension. None is automatic.