Manuscript XV-C@1 · XV-C.tex · section · 5afd124d
Numbering and downstream admission
Scope, conventions, and the permitted ending › Numbering and downstream admission · lines 199–217
XV-C@1#eq:admission
We retain the technical-continuation convention adopted in the supplied XV-B manuscript XVB. Thus XV-B and XV-C may study the unresolved construction before admission. The admission success criterion remains
It is a prerequisite for the intended downstream quantum use, not a prerequisite for writing this technical continuation.
The supplied XV-A text uses the earlier convention under which “XV-B remains closed” XVA. That naming convention is not reimposed here. The retained mathematical boundary is that the required quantum coefficient has not been admitted in the supplied releases.
Displayed formulas in this passage
XV-C@1#eq:admission · line 205