Manuscript XVI-P@p23 · XVI-P.tex · scope · 9b0037a7

Scope.

P.5 calculation, step 4 (p18): M2 discharged, D11 evaluated, the full hh slot · lines 522–528

Back to manuscript

.{p18 keeps the p14r contract and the p15, p16 and p17 calculation layers byte-identical (release_p18.py recomputes their sha256). It discharges the D11 matching premise M2 on the 4D components, evaluates D11 under the declared prescription, and rechecks the ch-projected hh slot with D11 included. quantum_inputs_evaluated is earned (every graph of the inventory is evaluated in one prescription). projected_identity_verified, projected_restoration_verified and bulk_symmetry_restored are NOT earned. O.1 stays NOT_CLOSED; the insertion stays frozen; XV-B and XIV-J are unopened; Route B is not discharged; no is added to .}