Manuscript XVI-P@p23 · XVI-P.tex · scope · 9b0037a7
p15 = P.5 calculation, first batch; D01, D03, D11 are NOT evaluated; no slot is complete.
Scope of revision p15: first P.5 calculation · lines 866–874
15 = P.5 calculation, first batch; D01, D03, D11 are NOT evaluated; no slot is complete.{
p15 evaluates the Batch A graphs D02, D12, D14a, D14b, D14c and the Batch B graph D13 under the frozen p14r
prescription: DRED R1–R6 with the algebra, contractions before the Laurent expansion, kept symbolic
and evanescent parts retained; Feynman ; MS-bar with ,
. The declared action is massless (no mass is declared).
quantum_inputs_evaluated, projected_defect_computed, projected_identity_verified and
projected_restoration_verified remain not earned, and bulk_symmetry_restored=false. O.1 is
NOT_CLOSED, the insertion stays frozen, XV-B and XIV-J stay closed, and Route B is not discharged. The new flags
batchA_evaluated and D13_evaluated each carry an execution, a claim and a scope part.}