Manuscript XVI-Q@Q11 · XVI-Q.tex · section · c7142b6c
Status and Q02 plan
Status and Q02 plan · lines 214–224
After Q01: O.2 Constructed; O.4 inventory (with E1); O.5 bulk open; O.6/O.7 bulk open; enlarge rule not triggered at . Hence O.1 is NOT_CLOSED. Q02 will:
evaluate the bulk O.5 graphs D04, D05a and D06 (full two-point), and settle D12 (Missing, never zero);
state and verify the bulk retained identity ST4a/ST4b on the full two-point sector;
solve for the bulk counterterms and attempt O.1.