Manuscript XII-B@1 · XII-B.tex · section · 229bc869

The required sentences and their actual status

B0: audit of the supplied XII-A handoff › The required sentences and their actual status · lines 322–367

Back to manuscript

The production specification requires the following handoff. We distinguish requirements from statements actually supplied.

Required XII-A statementSupplied status
H1The cubic model is changed before response formation, with a specified ramped density and its actual Euler source.Not supplied. XII-A retains the frozen XI-F/XI-G cubic functional.
H2The inverse remains , with no X-track rescaling.Supplied at the free normalization level.
H3The changed cubic Noether identity and all ramp-derivative terms are displayed.Not supplied for a changed cubic density.
H4The new map is not identified with the X-track source-switched mixed map.No new cubic map is defined, so the required changed-model comparison is not supplied.
H5The effect, if any, of the changed density on the fixed-input coupled jet is stated and justified.Not supplied. A disclaimer of jet repair is not a calculation for a new action.

In particular, XII-A's exclusion section identifies its as the frozen XI-F/XI-G functional. It does not replace that functional by a density-ramped one. Its declarations and proof ledger do not contain a changed cubic Noether theorem.

The normalization requirement H2 passes. The conjunction H1–H5 does not.

Nearby in this section